Facility Options

About Option A

Option A includes necessary improvements to arena storage and change rooms; social hub-lobby and office expansion; fitness area expansion; and a new leisure pool. View details and drawings about Option A (PDF – 1.2 MB).

About Option B

Option B includes all of Option A plus a 2nd ice sheet at the complex–teams rooms and lobby extension.

Option B Enhancement Components

Necessary Items

  • Demolition of condemned arena storage area
  • Acoustic improvements to the arena
  • Additional hockey change rooms

Fitness Area

  • New expanded fitness room (cardio, stretching, weights)
  • New fitness studio and storage (group classes)
  • Elevator and stair access to level 2

Arena

  • Regulation sized ice sheet
  • 150 spectator seats
  • Team rooms
  • Lobby extension to facilitate more leisure skating activities

Social Hub

  • Lobby expansion & upgrades
  • New reception
  • “Fireside” room
  • Warm viewing area to arena
  • Administration offices
  • Multipurpose / party room

Indoor Track

  • New indoor walking track

Pool

  • New leisure pool with water features, lazy river and beach entry
  • Change room retrofit
  • Universal change room expansion
  • Spray pad

Note: Professional consultants have determined the Pioneer Arena is neither sustainable nor viable and a plan is being developed for its closure. There will be no further taxpayer funds committed to do significant repairs to the facility. Information about the Pioneer Arena status and usage can be found in the May 2, 2017, public open house presentation.

If Option B is selected, a new ice sheet is planned to replace the Pioneer Arena.

If Option B is not supported, the Pioneer Arena will still be closed.

Option B Costs

Option B Cost breakdown